Skip to content
  • CASE STUDY

    NOVASHIELD TRANSFORMED SALT STORAGE WITH FASTER INSTALLATION, BRIGHTER INTERIORS, AND LONG-TERM DURABILITY. IT’S NOT JUST A FABRIC—IT’S A SMARTER WAY TO BUILD.

    CONNECT WITH US!

A transportation and logistics company required a large-scale, durable, and efficient storage solution for road salt. The facility needed to support high-volume storage while accommodating heavy vehicle traffic and year-round operations in a cost-effective and operationally efficient manner.

fast installation

The project faced several challenges, including aligning the new structure with the facility’s hillside location and ensuring it complemented the building’s modern design and color scheme. Most critically, the structure needed to withstand Massachusetts’ harsh winters, including heavy snow, strong winds, and extreme weather, to ensure safety and durability.

The primary challenge was to design and
construct a structure capable of storing over
100,000 tons of road salt while maintaining
low operational costs and ensuring ease
of use. The customer needed a building
that could facilitate the movement of large
vehicles, withstand the corrosive nature
of salt, and be installed quickly to meet
seasonal demand. Additionally, the interior
environment had to be safe and well-lit to
support continuous operations regardless of
weather conditions.

Salt-Storage-Facility-Building-Systems
Salt-Storage-Facility-Building-Systems

To learn more about Britespan Building Systems,
visit https://britespanbuildings.com/

The completed facility successfully met and exceeded the customer’s expectations. With a capacity to store over 100,000 tons of road salt, the building provided ample space for both storage and vehicle movement. The clear-span design enabled seamless logistics operations, allowing trucks to maneuver easily within the structure and reducing loading and unloading times.

Installation was completed more quickly than traditional construction methods, minimizing disruption and allowing the facility to become operational sooner. The natural lighting provided by NovaShield significantly improved working conditions inside the building, reducing the need for artificial lighting and enhancing safety. The fabric’s resistance to corrosion ensured the structure remained in excellent condition despite constant exposure to salt, reducing maintenance needs and extending the building’s lifespan.

salt-storage-facility-icons
Salt-Storage-Facility-Building-Systems
salt-storage-facility-quote

This case study demonstrates how NovaShield, combined with engineering expertise, delivered a high-performance, cost-effective solution for large-scale salt storage. The project highlights the importance of innovative materials and thoughtful design in meeting the complex needs of industrial storage applications. With its clearspan interior, quick installation, and durable, light-filled environment, the NovaShield solution proved to be an ideal choice for this demanding use case.

Name(Required)